Lewati ke konten
DemoSistem ini masih dalam tahap demo dan bukan layanan resmi. Data dapat dihapus kapan saja, dan pesanan, penawaran, serta pembayaran tidak berlaku sungguhan. Jangan memasukkan data kartu asli atau informasi pribadi yang sensitif.
Civentia
Annual Safety-Valve Inspection & Recertification — image 1
Regular inspection
Offline inspection

Annual Safety-Valve Inspection & Recertification

Annual PRV inspection

Keep pressure-relief assets compliant and audit-ready. Certified technicians inspect, bench-test and recertify safety and relief valves to ASME, API 527 and NBIC requirements — verifying set pressure, seat tightness and…

Disediakan oleh

Civentia Demo Inspection Services

4.8(12 ulasan)

Mulai dari

USD 1,200–4,800

Beli atau minta penawaran

  • Merespons dalam 24 jam
  • Waktu tunggu 5–7 business days
  • Global — on-site & depot
  • Penyedia terverifikasi — identitas & sertifikasi telah diperiksa
  • Catatan penugasan kelas audit untuk setiap pekerjaan
No. layanan
SVC20260820000001
Harga
Per valve
Industri
OIL_GAS
Dokumentasi kualifikasi

Ikhtisar

Keep pressure-relief assets compliant and audit-ready. Certified technicians inspect, bench-test and recertify safety and relief valves to ASME, API 527 and NBIC requirements — verifying set pressure, seat tightness and lift, then sealing and tagging each valve with a traceable digital certificate. On-site or at our accredited depot.

Keunggulan

Apa yang membedakan layanan ini.

  • ISO 17025-accredited test benches with full traceability
  • Set-pressure, seat-tightness and lift verification per ASME / API 527
  • Tamper-evident recertification tags and audit-ready digital certificates
  • On-site or depot service with sealed teardown photos for every valve

Proses

Bagaimana penugasan berjalan, langkah demi langkah.

  1. 1

    Request & scope — share asset list, set pressures and service window

  2. 2

    Mobilization — schedule certified technicians and calibrated rigs

  3. 3

    Inspection & testing — disassembly, bench test, lapping where required

  4. 4

    Recertification — re-set, seal, tag and reassemble to spec

  5. 5

    Reporting — digital certificates and the next-due-date schedule

Ketentuan

Syarat dan ketentuan layanan.

Pricing is per valve and varies by size, set pressure and location. Certificates are issued within 3 business days of test completion.